76
reclaimed land lying there,
would be a most desirable and remunerative work as rendering the land attractive for commercial or industrial enterprises, I called for reports from the Sanitary Superintendent and Resident Engineer of Water and Drainage Department.
These officers reported that in their opinion there
• nothing in the situation of the site to render it.
was
unhealthy
and that all.
the
that
that was
0.0.
574
207
(Ref 11 JAN JE
タグ
required to render it
salubrious was an efficient
subsoil drainage, for
which
the Resident Engineer has-
since submitted
a detailed reports were
scheme. These reports
referred to the Committee above
referred to who reported that although a thorough system of subsoil drainage might render the site heal
results
healthy,
the
of such works should be tested before the heavy- expenditure of building a Gaol